Case Study 5 – Joint Provision and Shared Use
To provide a multi-purpose facility to service the future community sport and recreation needs of Kalbarri.
Download this document
Project background
The coastal township of Kalbarri (population 2000) is 590km north of Perth and is a popular holiday centre, with the year round temperate climate attracting an increasing number of retirees. The existing Kalbarri Golf and Bowling Club did not have the capacity to service the increased number of visitors and members. It did not contain changeroom facilities, had limited catering facilities and the meeting room was not suitable for social activities. The centre is located on a reserve vested in Council for the purposes of recreation and services golf, bowls, tennis and netball.
-
Case Study 1 – Remote Community Combined Aquatic and Recreation Centre
-
Case Study 2 – Built Asset Refurbishment
-
Case Study 3 – Maximising Asset Use
-
Case Study 4 – Integrated Planning
-
Case Study 6 – Integrated Planning
-
Case Study 7 – Replacement Sports Surfaces
-
Case Study 8 – Swimming Pool Refurbishment




